The total installed capacity of this energy storage system is 645 kWh, fully utilizing the advantages of commercial and industrial storage (two charges and two discharges per day), resulting in an average annual income of approximately 190,000 yuan (RMB). The total project investment is about 750,000 yuan (RMB), with a payback period of approximately 3.5 to 4 years.
The total installed capacity of this energy storage system is 645 kWh, fully utilizing the advantages of commercial and industrial storage (two charges and two discharges per day), resulting in an average annual income of approximately 190,000 yuan (RMB). The total project investment is about 750,000 yuan (RMB), with a payback period of approximately 3.5 to 4 years.