The total installed capacity of this project is 199.52 kWp, with a grid connection mode that utilizes surplus electricity for self-consumption. The first-year electricity generation is 209,600 kWh, with an average annual output of approximately 190,000 kWh over 25 years. The average annual income is around 110,000 yuan (RMB), with a total project investment of about 560,000 yuan (RMB) and a payback period of approximately 5 years.
The total installed capacity of this project is 199.52 kWp, with a grid connection mode that utilizes surplus electricity for self-consumption. The first-year electricity generation is 209,600 kWh, with an average annual output of approximately 190,000 kWh over 25 years. The average annual income is around 110,000 yuan (RMB), with a total project investment of about 560,000 yuan (RMB) and a payback period of approximately 5 years.