Copyright © 2024 Guangzhou Tiger Head Energy Co., Ltd.
The total installed capacity of this project is 1,233.75 kWp, with a grid connection mode that utilizes surplus electricity for self-consumption. The first-year electricity generation is 1.35 million kWh, with an average annual output of approximately 1.25 million kWh over 25 years. The average annual income for 25 years is around 1.2 million yuan (RMB), with a total project investment of about 4.9 million yuan (RMB) and a payback period of approximately 4 years.
The total installed capacity of this project is 1,233.75 kWp, with a grid connection mode that utilizes surplus electricity for self-consumption. The first-year electricity generation is 1.35 million kWh, with an average annual output of approximately 1.25 million kWh over 25 years. The average annual income for 25 years is around 1.2 million yuan (RMB), with a total project investment of about 4.9 million yuan (RMB) and a payback period of approximately 4 years.