The total installed capacity of this energy storage system is 860 kWh, fully utilizing the advantages of commercial and industrial storage (two charges and two discharges per day), resulting in an average annual income of approximately 320,000 yuan (RMB). The total project investment is about 1.05 million yuan (RMB), with a payback period of approximately 3 to 3.5 years.
The total installed capacity of this energy storage system is 860 kWh, fully utilizing the advantages of commercial and industrial storage (two charges and two discharges per day), resulting in an average annual income of approximately 320,000 yuan (RMB). The total project investment is about 1.05 million yuan (RMB), with a payback period of approximately 3 to 3.5 years.